Question no 3587 : Capacity Load in Production Order

In SAP PP as at ECC6.0 EhP6, select the time parameters can do not affect the calculation of capacity load for work center of an operation in a production order ?

(more than one answers)

A)  Setup time.
B)  Processing time.
C)  Wait time.
D)  Move time.
E)  Queue time.
.

Answer: C, D, E

Wait, Move, Queue are all inter-operation times with no impact on capacity loads of the work center.