This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Monday, May 1, 2017

Question no 3385 : Cost collection in SAP PLM module

In SAP PLM as at ECC6.0 EhP5, which of the following objects or documents in SAP PLM module can be configured to assist in collecting costs ?

(more than one answers)

A)  Maintenance Notification.
B)  Maintenance Order.
C)  QM Notification.
D)  QM Inspection Lot.
E)   Network Order.
.

Answer: B, C, D, E

B,E) Both MO and Network Order are similar to PP Prod Order, PI Process Order, or Internal Orders and there are designed to collect costs.

C,D) However, QM Notification and Inspection Lot are not similar to those of B,E) above, but there can be configured to link to a QM Order for cost collection.

A) Maintenance Notification has yet to have any feature itself or link to a cost collector document.

So, in PLM, the following either directly or indirectly can be configured for cost collection:
PS - Network Order
PM - Maintenance Order
CS - Service Order
QM - QM Notification via QM Order
QM - QM Inspection Lot via QM Order

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.