In SAP MM as at ECC6.0 EhP6, in the transaction MMSC to extend Material with Storage Locations, which of the following data fields are allowed entry in the MMSC data screen ?
(more than one answer)
A) Bin ID.
B) SLoc MRP Indicator.
C) ReOrder Point.
D) Fixed Lot Size.
E) Special Procurement Type.
.
(more than one answer)
A) Bin ID.
B) SLoc MRP Indicator.
C) ReOrder Point.
D) Fixed Lot Size.
E) Special Procurement Type.
.
Answer: A, B, C, D, E
ReplyDeleteAll of the above + the SLoc.