In SAP SD/LE ECC6.0, the Material Availability Date is the _____________________ .
(only one answer)
A) Start of the Pick/Pack time.
B) Start of the Transportation Planning time.
C) Start of the Loading time.
D) Start of the Transit time.
E) Start of the Staging time.
.
(only one answer)
A) Start of the Pick/Pack time.
B) Start of the Transportation Planning time.
C) Start of the Loading time.
D) Start of the Transit time.
E) Start of the Staging time.
.
Unless the Pick/Pack time's duration is equal to the Transportation Planning Lead time duration, (usually Pick/Pack times are longer the Transportation Planning Time), the AV date is when ready for Picking and Packing.