In SAP SD/LE ECC6.0, the time required to ship an outbound delivery to the ship-to party is called the _______________ ?
(only one answer)
A) Transit time.
B) Loading time.
C) Pick/Pack time.
D) Delivery time.
E) Transportation Lead time.
.
(only one answer)
A) Transit time.
B) Loading time.
C) Pick/Pack time.
D) Delivery time.
E) Transportation Lead time.
.
Review all the time elements used during the backward scheduling of from the delivery date of the item in the Order.
ReplyDelete