In SAP SD/LE ECC6.0, the Transportation Planning Date is scheduled backwards from ____________ .
(only one answer)
A) Start of the Transit Time.
B) End of the Transit Time.
C) Start of the Loading Time.
D) End of the Loading Time.
E) Start of the Pick/Pack Time.
.
(only one answer)
A) Start of the Transit Time.
B) End of the Transit Time.
C) Start of the Loading Time.
D) End of the Loading Time.
E) Start of the Pick/Pack Time.
.
Answer: C
ReplyDeleteBoth the Pick/Pack time and the Transportation Planning time is scheduled backwards from the Start of the Loading time.
ReplyDelete