In SAP MM ECC6.0, which of the following Manual Reservation Scenarios are possible ?
(more then one answers)
A) Reservation for Consumption to Cost Center.
B) Reservation for Transfer Posting using One-Step transfer for Plant to Plant.
C) Reservation for Transfer Posting using Two-Step transfer for Plant to Plant.
D) Reservation for Transfer Posting using One-Step transfer for Storage Loc to Storage Loc.
E) Reservation for Transfer Posting using Two-Step transfer for Storage Loc to Storage Loc.
.
(more then one answers)
A) Reservation for Consumption to Cost Center.
B) Reservation for Transfer Posting using One-Step transfer for Plant to Plant.
C) Reservation for Transfer Posting using Two-Step transfer for Plant to Plant.
D) Reservation for Transfer Posting using One-Step transfer for Storage Loc to Storage Loc.
E) Reservation for Transfer Posting using Two-Step transfer for Storage Loc to Storage Loc.
.
Answer: A, B, D
ReplyDeleteC, E) As at ECC6.0 EhP4, you cannot create Reservation for a 2-step Transfer.
ReplyDelete