Question no 1979 : Manual Re-Order Point

In SAP MM, when setting up Manual Re-Order Point, the following data fields are mandatory (delivered by SAP) in the MRP1 and MRP2 view.

(more then one answers)

A)  Lot-Size Key
B)  MRP Controller
C)  Rounding Profile
D)  Planned Delivery Time
E)  Safety Stock
.

2 comments:

  1. The Manual Re-Order Point MRP Type "VB" requires you to enter the following:
    . MRP Controller (MRP 1 view)
    . Lot Size Key (MRP 1 view)
    . Procurement Type (MRP 2 view)
    . Planned Delivery Time (MRP 2 view)
    . Scheduling Margin Key (MRP 2 view)