In SAP QM, Which of the following control parameters can be setup either at the material master inspection type detail or the inspection plan header ?
I) Dynamic Modification Rule.
II) Sampling Procedure.
III) Inspection Point.
IV) Work center.
V) Auto UD.
A) I, III
B) I, II, III, V
C) II, III, IV
D) II
E) I
.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.