In SAP QM, At usage decision, which of the following processes are possible:
I) UD can automatically make inventory postings on the bases of the usage decision.
II) The Quality level is updated based on the inspection results.
III) Follow-up actions can be triggered automatically upon the UD.
IV) Quality scores can be calculated.
A) I, III
B) II, IV
C) I, II, III
D) II, III, IV
E) I, II, III, IV
.
Answer: E
ReplyDelete