In SAP ECC 6.0 Ehp7, use the following data to calculate the Cost of the Raw Material.
Finished Goods with Assembly Scrap Factor 5%
Raw Material with Component Scrap Factor in the Material Master 10%
Raw Material with Component Scrap Factor in the Material Master 5%
BOM show 1 pc of Raw Material to product 1 pc of Finished Goods
Raw Material MAP is $20/pc
What is the Cost of the Raw Material ?
(only one answer)
A) $12.60
B) $22.00
C) $23.10
D) $13.60
E) $22.06
Answer: E
Explanations:
Assembly Scrap Factor 5%
Component Scrap Factor 10%
1+ (1 x 5%) = 1.05
1.05 + (1.05 x 5%) = 1.1025
Raw Material Costs is 1.1025 x $20 = $22.05
In SAP, there my be rounding to 3 decimals
so
1.05 + (1.05 x 5%) = 1.1025 >> 1.103
Raw Material Costs could be 1.103 x $20 = $22.06
Finished Goods with Assembly Scrap Factor 5%
Raw Material with Component Scrap Factor in the Material Master 10%
Raw Material with Component Scrap Factor in the Material Master 5%
BOM show 1 pc of Raw Material to product 1 pc of Finished Goods
Raw Material MAP is $20/pc
What is the Cost of the Raw Material ?
(only one answer)
A) $12.60
B) $22.00
C) $23.10
D) $13.60
E) $22.06
Answer: E
Explanations:
Assembly Scrap Factor 5%
Component Scrap Factor 10%
1+ (1 x 5%) = 1.05
1.05 + (1.05 x 5%) = 1.1025
Raw Material Costs is 1.1025 x $20 = $22.05
In SAP, there my be rounding to 3 decimals
so
1.05 + (1.05 x 5%) = 1.1025 >> 1.103
Raw Material Costs could be 1.103 x $20 = $22.06