S/4 1809, when Advanced Planning is activated for a Material Master ?
(More than one answers)
A) A special Material type "X0" must be set in the MRP 1 view for using the Advanced Planning run.
B) Once activated for Advanced Planning, the Material cannot be planned using classic MRP run.
C) The Material can be planned using classic MRP, MRP Live, or Advanced planning PPDS.
D) Planning parameters from Materials master to the Product master is in Display mode in the Product Master.
E) Re-Order Point Planning must still be executed in classic MRP run.
.
Answers: C, D
A) MRP type "PD" can be used. "X0" is for previous ERP with the external APO system.
B, C) Testing shows even Material activated for Advanced Planning, the Material can still be planned using PPDS, MRP Live or Classic MRP run.
D) Transaction code /SAPAPO/MAT1 currently shows as Display even in Change Mode.
E) Re-Order Point Planning Heuristics is available in PPDS.