In SAP PM as at ECC6.0 EhP6, which of the following are possible methods for component selection in the Maintenance Order ?
(more than one answers)
A) Material BOM assigned to the Work Center of the Operation.
B) Technical Object's Construction Type BOM.
C) Technical Object's BOM.
D) Internet Catalog.
E) Visual Enterpriser Spare Parts.
.
Answers: B, C, D, E
B) EQ and FL entered as Reference Object in the MO can have a Construction Type with a Material BOM.
C) EQ and FL itself can have EQ BOM or FL BOM.
D) If Web Catalog has been setup for the Order Type.
E) Visual Enterprise Spare Parts via DMS assigned to the Operation allows Spare Parts selection via a Graphical interface.
(more than one answers)
A) Material BOM assigned to the Work Center of the Operation.
B) Technical Object's Construction Type BOM.
C) Technical Object's BOM.
D) Internet Catalog.
E) Visual Enterpriser Spare Parts.
.
Answers: B, C, D, E
B) EQ and FL entered as Reference Object in the MO can have a Construction Type with a Material BOM.
C) EQ and FL itself can have EQ BOM or FL BOM.
D) If Web Catalog has been setup for the Order Type.
E) Visual Enterprise Spare Parts via DMS assigned to the Operation allows Spare Parts selection via a Graphical interface.