Question no 3884 : Backflush Material

In SAP PP as at ECC6.0 EhP6, which of the following setting ensure Backflush is executed for a Component assigned to a Work Center in the Routing Operation ?

(more than one answers)

A)  Backflush indicator in the Material Master MRP 2 data view.
B)  Backflush indicator in the BOM item detail.
C)  Backflush indicator in the Work Center Master.
D)  Backflush indicator in the Operation Control Key.
E)  Backflush indicator in the Material Master Work Scheduling data view.
.

Answers: A, C

A) Material Master MRP 2 data view Backflush indicator set with "depending on Work Center".
C) The Work Center Master Basic/General data view backflush indicator selected.