In SAP PP as at ECC6.0 EhP6, which of the following are settings required for the By-Product Material in a BOM ?
(only one answer)
A) By-Product indicator in the BOM item detail.
B) By-Product item category of the Material assigned to the BOM.
C) A Negative Quantity for the BOM Material as a By-Product.
D) Joint Production to activate to Cost Apportionment Structure in the Material Master.
E) Create BOM with Co-Product BOM Usage.
Answer: C
Only -ive Qty to indicate a Material is a By-Product.
(only one answer)
A) By-Product indicator in the BOM item detail.
B) By-Product item category of the Material assigned to the BOM.
C) A Negative Quantity for the BOM Material as a By-Product.
D) Joint Production to activate to Cost Apportionment Structure in the Material Master.
E) Create BOM with Co-Product BOM Usage.
Answer: C
Only -ive Qty to indicate a Material is a By-Product.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.