In SAP MM/PP as at ECC6.0 EhP6, which of the following are TRUE about MRP Type "VB" in the Standard SAP System ?

(moret han one answers)

A)  Material with "VB" cannot be part of the BOM.
B)  Safety Stock is mandatory.
C)  Re-Order Point Quantity is mandatory.
D)  MD01 ignores such material in the planning process.
E)  MD01 and MD02 considers such material in the planning process.
.

Answers: C, E

A) Material with "VB" can be in the BOM except no dependent requirement is created.
B) In Standard SAP, "VB" is delivered without Auto Safety Stock calculation.
C) ROP is Mandatory by design for Re-Order Point.
D, E) Both MD01 and MD02 considers Materials with "VB".