This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Tuesday, February 2, 2021

Question no 3796 : RR after UD

In SAP QM as at ECC6.0 EhP6, which of the following allows RR after UD ?

(only one answer)

A)  Master Inspection Characteristics with "Long Term Characteristics" indicator.
B)  Inspection Lot Document Type.
C)  Not Possible.
D)  Settings in the Quality Info Record.
E)  Settings in the Inspection Type detail in the Material Master.
.

Answer: A

Long Term Characteristics allow RR to be done after UD.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.