In SAP PP as at ECC6.0 EhP6, which of the following are Controls possible for Material Requirements via the Material Status ?
(more than one answers)
A) Planned Independent Requirement maintenance.
B) Forecasting run.
C) MRP run.
D) Long Term Planning run.
E) SOP Planning table maintenance.
.
click "1 comment" to view possible soultion
(more than one answers)
A) Planned Independent Requirement maintenance.
B) Forecasting run.
C) MRP run.
D) Long Term Planning run.
E) SOP Planning table maintenance.
.
click "1 comment" to view possible soultion
Answers: A, B, C, D
ReplyDeleteCheck "Material Requirements" segment in the Material Status configuration at OMS4.