In SAP PM as at ECC6.0 EhP6, which of the following are correct assignments possible for an Equipment Master ?
(more than one answers)
A) Exactly one permit can be assigned to an Equipment Master.
B) Exactly one Construction Type can be assigned to an Equipment Master.
C) One or more sub-Equipments can be assigned to a Superior Equipment.
D) An Equipment Master can be assigned to one or more Functional Location.
E) One or more Cost Centers can be set as default to an Equipment Master.
.
Answers: B, C
(more than one answers)
A) Exactly one permit can be assigned to an Equipment Master.
B) Exactly one Construction Type can be assigned to an Equipment Master.
C) One or more sub-Equipments can be assigned to a Superior Equipment.
D) An Equipment Master can be assigned to one or more Functional Location.
E) One or more Cost Centers can be set as default to an Equipment Master.
.
Answers: B, C