In SAP MM as at ECC6.0 EhP6, which of the following are correct about Purchase Requisitions ?
(more than one answers)
A) A PR can be saved with or without a Plant.
B) A PR can be saved with or without a Purchasing Group.
C) A PR can be saved with or without a Purchasing Organization.
D) A PR can be saved with or without a Storage Location.
E) A PR can be saved with or without a Delivery Date.
.
Answer: B, C, D
In Standard SAP Delivery, Plant and Delivery Date is Mandatory by design.