This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Friday, December 28, 2018

Question no 3609 : Plant Maintenance BOM relevancy

In SAP PM as at ECC6.0 EhP7, to be able to use the Material BOM in Plant Maintenance, the following must be TRUE of the BOM creation ?

(only one answer)

A)  The BOM must be created with the relevant BOM usage.
B)  The Material Master in the BOM Header must be created with Material Type "IBAU".
C)  The Plant for the BOM must be a Maintenance Plant.
D)  The Status of the BOM must be assigned with Plant Maintenance Relevance.
E)  The Header BOM must be set with a "PM" Assembly Indicator.
.

Answer: A

Standard SAP BOM Usage "4" for PM.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.