In SAP QM as at ECC6.0 EhP6, which of the following are not correct about Material Specification ?

(more than one answers)

A)  You can assign the Dynamic Modification Rule in the Header.
B)  You can assign a Sampling Procedure for the Master Inspection Characteristics in the Material Spec.
C)  You must assign a Work Center for the Inspection Task in the Material Spec.
D)  A Plant is not necessary for a Material Specification.
E)  A Material Specification can be assigned to one or more Materials.
.

Answer: A, C, D, E

A) Material Specification has no Header.
C) Unlike Inspection Plan, Work Center is not possible in Material Spec.
D) Plant is still necessary for Material Spec.
E) Material Specs are unique for each Material and independent of Inspection Type.