This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Sunday, April 9, 2017

Question no 3382 : Material Master QM data view parameters

In SAP QM as at ECC6.0 EhP6, which of the following control parameters are possible in the Material Master QM data view ?

(more than one answers)

A)  Vendor QM System requirements.
B)  Sample Determination.
C)  Dynamic Modification.
D)  Recurring Inspection cycle.
E)  Inspection Type.
.

Answer: A, B, C, D, E

You do have to be familiar with most of the parameters in the Material Master, Quality Info Record, and Master Inspection Characteristics. 

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.