In SAP MM or PP in MRP planning as at ECC6.0 EhP6, the implementation of "Last Lot Exact" for Quantity determination can be done via which of the following ?
(only one answer)
A) MRP Type.
B) Time Fence.
C) MRP Strategy.
D) Availability Check Group.
E) Lot Size Key.
.
(only one answer)
A) MRP Type.
B) Time Fence.
C) MRP Strategy.
D) Availability Check Group.
E) Lot Size Key.
.
Answer: E
ReplyDeleteVia the Lot Size Key in the IMG, there is a a parameter setting for "Last Lot Exact".