In SAP QM as at ECC6.0 EhP7, to setup QM for UD only (without RR), the mandatory requirements are the following ?
(more than one answer)
A) Activate an Inspection Type in the Material Master QM data view.
B) Assign a Sampling Technique in the Inspection Type detail.
C) Minimum of One Master Inspection Characteristics.
D) A Material Specification with only one Master Inspection Characteristics.
E) Check Auto UD in the Inspection Type detail.
.
(more than one answer)
A) Activate an Inspection Type in the Material Master QM data view.
B) Assign a Sampling Technique in the Inspection Type detail.
C) Minimum of One Master Inspection Characteristics.
D) A Material Specification with only one Master Inspection Characteristics.
E) Check Auto UD in the Inspection Type detail.
.
Answer: A, B
ReplyDeleteMIC, Material Spec, Inspection Plan are not required. Auto UD has no concern on the question, so it can be with or without.