In SAP MM ECC6.0, which of the following MRP types are Consumption Based Planning ?
(more than one answers)
(A) Lot for Lot.
(B) Manual Re-order point.
(C) MPS.
(D) MRP.
(E) Forecast-based planning.
.
(more than one answers)
(A) Lot for Lot.
(B) Manual Re-order point.
(C) MPS.
(D) MRP.
(E) Forecast-based planning.
.
Answer: B, E
ReplyDeleteThe following are categories of MRP type for CBP:
ReplyDelete. Re-order Point.
. Time-phased.
. Forecasting.