An Apportionment structure is assigned in MRP2 View of the Material Master for Products or Material Master with Co-Product and requires the Cost to be Split(Apportioned) between the Primary Product and Co-Products. The Appointment Structure contains instruction of percentage splits to Primary and Co-Products.
An Apportionment structure is assigned in MRP2 View of the Material Master for Products or Material Master with Co-Product and requires the Cost to be Split(Apportioned) between the Primary Product and Co-Products. The Appointment Structure contains instruction of percentage splits to Primary and Co-Products.
ReplyDelete