Question no : 107 CO Product Costing

In SAP CO, Which of the following statements are FALSE describe Product Cost Planning functions ?

I)     Multiple cost component structure are permitted for each company code for standard cost estimates.
II)    Determining prices through planned price iteration is one of the requirements to create primary cost component splits.
III)   To determine overhead, the costing sheet is used to derive them.
IV)   When a multi-level BOM is costed, the costs are split from top-to-bottom based on specific ratios.

A)    I, III
B)    I, IV
C)    II, III
D)    II, IV
E)    I, IV
.