In SAP PM, the following characteristics depicts which scenario introduced in ECC6.0 EhP4 ?
. Assign the Technical Object for each operations in the Maintenance Order.
. Assign the related measuring point for the technical object in each operation to it via the PRT.
. Record the measurement results in the "Overall Completion Confirmation" for each measuring point.
(only one answer)
A) PRT assignment.
B) Inspection Rounds.
C) Measurement reading list.
D) Object list entries.
E) Object integration.
.
. Assign the Technical Object for each operations in the Maintenance Order.
. Assign the related measuring point for the technical object in each operation to it via the PRT.
. Record the measurement results in the "Overall Completion Confirmation" for each measuring point.
(only one answer)
A) PRT assignment.
B) Inspection Rounds.
C) Measurement reading list.
D) Object list entries.
E) Object integration.
.