In SAP MM as at S/4 1909, Kanban Replenishment with Control Type "2 Working with Scheduling Agreement" expects which of the following pre-requisites ?
(more than one answers)
A) Storage Location with PSA for Kanban assigned to the Scheduling Agreement item.
B) Kanban Indicator in the Scheduling Agreement item.
C) Kanban Indicator in the Material Master Purchasing data view.
D) MRP 4 data view for Storage Location without Planning in the Material Master MRP 4 data view.
E) A Source List.
.
Answer: A, B
The following setup is desirable:
. Replenishment Strategy for External Procurement with Control Type "2 Working with Scheduling Agreements" with default Goods Receipt Movement Type.
. PSA assigned to SLoc for Kanban.
. MRP Area assigned to SLoc for Kanban.
. Material Master MRP1 vew assigned to MRP Area (Kanban SLoc) with MRP type "ND" for No Planning.
. Extend Material Master to the Kanban SLoc.
. Scheduling Agreement item assigned to Kanban SLoc.
. Scheduling Agreement item detail (via Additional data) assign to Kanban Indicator "X".
. Setup Control cycle for the Material with the Replenishment Strategy and assign the Scheduling Agreement item to it.
(more than one answers)
A) Storage Location with PSA for Kanban assigned to the Scheduling Agreement item.
B) Kanban Indicator in the Scheduling Agreement item.
C) Kanban Indicator in the Material Master Purchasing data view.
D) MRP 4 data view for Storage Location without Planning in the Material Master MRP 4 data view.
E) A Source List.
.
Answer: A, B
The following setup is desirable:
. Replenishment Strategy for External Procurement with Control Type "2 Working with Scheduling Agreements" with default Goods Receipt Movement Type.
. PSA assigned to SLoc for Kanban.
. MRP Area assigned to SLoc for Kanban.
. Material Master MRP1 vew assigned to MRP Area (Kanban SLoc) with MRP type "ND" for No Planning.
. Extend Material Master to the Kanban SLoc.
. Scheduling Agreement item assigned to Kanban SLoc.
. Scheduling Agreement item detail (via Additional data) assign to Kanban Indicator "X".
. Setup Control cycle for the Material with the Replenishment Strategy and assign the Scheduling Agreement item to it.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.