In SAP PP as at S/4 1909, Classic Kanban Replenishment for Production Orders have which the following characteristics ?
A) Material set with MRP Type “PD” (MRP Planning) are not allowed for Classic Kanban Control Cycle.
B) The Storage Location view in the Material Master must set for without Planning.
C) MRP type "ND" will allow Classic Kanban Control Cycle to be created for the Material.
D) Purchasing Group is Mandatory assignment in the Control Cycle for External Procurement Strategy.
E) MRP Controller is Mandatory assignment in the Control Cycle for In-house Procurement Strategy.
.
(only one answer)
Answer: A, C, E
A) Material set with MRP Type “PD” (MRP Planning) are not allowed for Classic Kanban Control Cycle.
B) The Storage Location view in the Material Master must set for without Planning.
C) MRP type "ND" will allow Classic Kanban Control Cycle to be created for the Material.
D) Purchasing Group is Mandatory assignment in the Control Cycle for External Procurement Strategy.
E) MRP Controller is Mandatory assignment in the Control Cycle for In-house Procurement Strategy.
.
(only one answer)
Answer: A, C, E
Relevant Master Data Management Transaction sfor Kanban:
• Material Master (MM01, MM02, MM03)• Production Supply Area (PK05)• Control Cycle (PK01, PK02, PK03 or PKMC)• Print Kanban (PK17)• Change Life-Cycle Status (PKLCM)