In SAP Production Planning & Execution as at S/4 1909, which of the following Parameters provides the following controls:
. BOM and Rouning selection. Batch Determination Procedure. Status Change Documentation. Costing Variants for Planned and Actual Costs
(only one answer)
A) Order Type Plant independent Parameter
B) Order Type Plant dependent Parameter
C) Confirmation Parameter.
D) Production Scheduler Profile.
E) Non of the above.
.
Answer: B