Question no 3937 : S/4 Material Master MRP4 data view changes

In S/4 1809, which of the following are the changes in the MRP data views in the Material Master ?

(More than one answers)

A) Storage Location data view in MRP4 is no longer possible.
B) MRP area is now Mandatory.
C) BOM selection method in MRP4 view is no longer available.
D) Quota Arrangement Usage is no longer available.
E) MRP Group usage is no longer useful.

Answers: A, C, D

The following findings as at S/4 1809:
A. MRP 4 view - Storage Location setting is no longer available

B. MRP 1 view - MRP area is recommended to replace to Storage Location MRP feature

C. MRP 4 view - BOM Selection method no longer available

D. MRP 2 view - Quota Arrangement Usage field is no longer needed

E. MRP 1 view - MRP Group is still relevant.