This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Wednesday, June 23, 2021

Question no 3854 : Process Quality Inspection for PP

In SAP PP/QM as at ECC6. 0 EhP6, which of the following settings are expected for initiating Process Quality Inspection for Production Order ?
(As at S/4 Hana 1909, same setup)

(more than one answers)

A)  Assign Inspection Point to the Routing Header.
B)  Assign Inspection Point to the Inspection Plan Header.
C)  Assign an appropriate Inspection Type to the Material Master.
D)  Activate a PP Order Type for QM.
E)  Assign Master Inspection Characteristics to he Routing Operation.
.

Answers: A, C, E

A, B) PQC uses the Routing Instead of the Inspection Plan, Inspection Point is therefore assign at the Routing.
C) Inspection Type 03
D) No specific requirement in activating QM in the PP Order Type.
E) Since it is Routing for PQC (Process Quality Control), therefore MICs are assigned to the Routing Operations.
The following are basic setup requirements:
1) Material Master QM data view assign Inspection Type 03.
2) Assign appropriate Inspection Point (eg: 150) in the Routing Header.
3) Assign appropriate Control Key (eg: PP06) to Routing Operation.
4) Assign QM Characteristics to Routing Operation with correct Sampling Procedure.
5) Set "Time" or "Quantity" related data in the Routing Operation detail.


No comments:

Post a Comment

Note: Only a member of this blog may post a comment.