In SAP QM as at ECC6.0 EhP6, which of the following are where the Inspection Plan has where Material Specification does not have ?
(more than one answers)
A) Dynamic Modification level.
B) Header.
C) Group number and Group Counter.
D) Inspection Point.
E) Sampling Procedure.
.
Answers: A, B, C, D
Sampling Procedure is possible for both.
(more than one answers)
A) Dynamic Modification level.
B) Header.
C) Group number and Group Counter.
D) Inspection Point.
E) Sampling Procedure.
.
Answers: A, B, C, D
Sampling Procedure is possible for both.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.