Question no 1612: Call Horizon

In SAP PM ECC6.0, When the Call Horizon is 100 %, ___________________ .

(only one answer)

A) The Planning will be done for the entire horizon of the scheduling period.
B) The Call Date is exactly one cycle before the Plan Date / Due Date.
C) The Call Date is exactly one cycle later then the Plan Date / Due Date.
D) The Call Date = Plan Date / Due Date.
E) The Call Date is at the end of the horizon of the scheduling period.
.

2 comments:

  1. If the call horizon is 100%; the plan date is equal to the call date. And if the call horizon is 0%, then the call date is exactly one cycle before the plan date.