In SAP MM and PP, assume the following data and determine the source determination during an MRP Run for the requirement quantity of 1200 ?
Material master is assigned with Lot Sizing "ES".
(Assuming Quota-Based Qty : 0 for all Vendors in the Quota Arrangement)
Quota for Vendor A : 1, Allocated Qty : 1200
Quota for Vendor B : 2, Allocated Qty : 1400
Quota for Vendor C : 3, Allocated Qty: 4800, max quantity 2000
Minimum to Split is 1000
Deduce the correct statement from below.
(only one answer)
A) One Supply to Vendor B with the 1200 quantity.
B) 4 supplies created, Vendor A gets 200, Vendor B gets 400, Vendor C gets 400, and a PR without vendor of 200.
C) 3 supplies created, Vendor A gets 300, Vendor B gets 500, Vendor C gets 400.
D) 3 supplies created, Vendor A gets 200, Vendor B gets 400, Vendor C gets 600.
E) Vendor A gets 400, Vendor B gets 800 in two different supplies.
.
Answer: E
ReplyDelete