In SAP PP, which of the following field allows the "Requirement quantities of dependent materials are grouped together during MRP run":
A) A specific lot-sizing key in the MRP 1 view of the material master.
B) The AV check group field int he MRP 3 view of the material master.
C) A Make-to-Order strategy in the MRP 3 view of the material master.
D) The Stock-determination Group field in the MRP 2 view of the material master.
E) The individual/collective field in the MRP 4 view of the material master.
.