The duration between the "Opening date" and the "Order start date" for a planned order is called the "Opening Period", in which parameter the key is configured in the MRP view in the material master ?
A) Safety time profile.
B) Scheduling margin key.
C) Lot sizing key.
D) MRP controller.
E) Strategy group.
.