Which of the following planning run transactions can be used for "NEUPL" ?
I) Single-Item-Single-Level MRP run.
II) Single-Item-Multi-Level MRP run.
III) On-line MPR run at the Plant level.
IV) Background MRP run at the Plant level.
V) Interactive MRP run.
A) I, II, III
B) III, IV
C) IV
D) V
E) I, II, III, IV, V
Answer: B