When will the system flag the "NETCH" indicator for a material master with strategy group 40 ?
(demands = planned independent requirements)
I) New demands are introduced within the planning horizon.
II) New demands are introduced outside the planning horizon.
III) The lot size key in the MRP 1 view is changed.
IV) The material status in the MRP 1 view is selected for MRP activation.
V) Previous demands are removed from the planning horizon.
A) I, II, V
B) I, V
C) II, V
D) I, II, III, IV, V
E) I, II, III, V
.
(demands = planned independent requirements)
I) New demands are introduced within the planning horizon.
II) New demands are introduced outside the planning horizon.
III) The lot size key in the MRP 1 view is changed.
IV) The material status in the MRP 1 view is selected for MRP activation.
V) Previous demands are removed from the planning horizon.
A) I, II, V
B) I, V
C) II, V
D) I, II, III, IV, V
E) I, II, III, V
.
Answer: E