When is "Auto UD" possible ?
I) setting is done at the inspection type detail in the material master.
II) setting is done at the inspection plan header for the material master.
III) result recording was completed without defect and non-conformity.
IV) inspection lot with "SKIP" status.
A) I, II, IV
B) II, III, IV
C) I, III, IV
D) I, III
E) I, II, III, IV
.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.