In SAP PP/MM, Which of the following is NOT TRUE about Stocks Requirement List and MRP List ?
I) Stocks Requirement List is dynamic while MRP List is static.
II) MRP List is always generated during an MRP run while the Stocks Requirement List is not.
III) Online conversion from planned order to purchase requisition is only allowed in the Stocks Requirement List and cannot be done in the MRP List.
IV) Only MRP run at the Plant level can have options to generate the MRP List.
A) II, III
B) II, IV
C) I, II, III
D) II, III, IV
E) III, IV
.
Answer: D
ReplyDelete