In SAP MM and PP, in-order for the planning results to recognize the source list and perform source determination during the MRP run, what is the mandatory setting required ?
(select the best possible answer, only one answer)
A) Set the Source List requirement indicator in the material master purchasing view.
B) Ensure a valid planning file entry was setup.
C) Assign the MRP group to the material master at the MRP view.
D) Set up the Purchasing-Planning integration flag in the MRP view.
E) Ensure the correct MRP relevancy indicator is set in the Source List.
.
(select the best possible answer, only one answer)
A) Set the Source List requirement indicator in the material master purchasing view.
B) Ensure a valid planning file entry was setup.
C) Assign the MRP group to the material master at the MRP view.
D) Set up the Purchasing-Planning integration flag in the MRP view.
E) Ensure the correct MRP relevancy indicator is set in the Source List.
.
The Source List indicator "1" in the Source List allows the MRP run to recognize the Source List and perform Source Determination for the Procurement element created.