Question no : 208 Production MRP Lot Sizing

In SAP PP, The supplier is providing packaging of 2 types of boxes; type 1 for 100 pcs pack and type 2 for 25 pcs pack. When you requirement is 144, we would like MRP go generate a quantity of 150 (1 box of 100 and 2 boxes of 25). Which of the following parameter is appropriate ?

A)   Rounding value.
B)   Rounding profile.
C)   Fixed lot size.
D)   Minimum 25, Maximum 150.
E)   Creation profile.
.