In SAP PP/LDM, Which of the following is NOT TRUE about the Bills of Material Structure ?
A)   The BOM alternative identification can be an external number by the user. 
B)   A BOM can be assigned to multiple plants.
C)   The BOM number is always an internal number range generated.
D)   A bill of material first created will have an alternative of 1.
E)   A BOM can be a maximum of 99 alternatives.
.
 
Answer: A
ReplyDelete