Unit 02 Management of Task Lists.
You can assign the components to the task list using the following methods:
(more than one answers)
(A) Structure list.
(B) Free assignment without BOM or structure list.
(C) From the bills of materials for the maintenance technical object assigned to the task list.
(D) Create a new material number directly from the maintenance task list and assign to the operation.
(E) Structure graphics.
.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.