This Blog is mainly on SAP Exam Questions and Selected "How-to" SAP processes

Showing posts with label Test : Customer Service - Preventive. Show all posts
Showing posts with label Test : Customer Service - Preventive. Show all posts

Friday, April 3, 2015

Question no 2926 : Single Cylce MP call object screen variations

In SAP PM/CS as at ECC6.0 EhP6, which of the following are common data fields when creating a single cycle maintenance plan where the call object is maintenance notification and maintenance order ? 

(more than one answers)

A)   Priority.
B)   Maintenance Activity Type.
C)   Settlement Rule.
D)   Maint. Work Center.
E)   Planning Plant/Planner Group.
.

Question no 2925 : Inspection Container in Result Recording for Equipment Calibration

In SAP PM/CS ECC6.0 EhP6, which of the following parameter ensures Equipments registered within a Calibration Maintenance Plan; when performing resulting recording, the system provides containers for recording results of calibration for each of the Equipment registered ?

(only one answer)

A)  Inspection Point assign to the Inspection Origin.
B)  Inspection Point assign to the Inspection Type.
C)  Inspection Point assign to the Task List header.
D)  Inspection Point assign to the Functional Location Master.
E)  Inspection Point assign to the Equipment Master.
.

Question no 2924 : Inspection Origin for Plant Maintenance/Customer Service

In SAP PM/CS as at ECC6.0 EhP6, standard SAP system delivery which of the following Inspection Origin for use in PM/CS Calibration Process ?

(only one answer)

A)  01.
B)  04.
C)  14.
D)  24.
E)  18.
.

Question no 2923 : Setting up for Calibration Maintenance Planning

In SAP PM/CS as at ECC6.0 EhP6, to ensure an Equipment/Functional location can be setup in a Maintenance Plan for Calibration which will call a Maintenance Order with Inspection Lot for managing the calibration process, which of the following preliminary setting is required ?

(only one answer)

A)  Assign Inspection Type to Functional Location or Equipment.
B)  Assign Inspection Type to the Maintenance Plant in the customizing.
C)  Assign Inspection Type to Maintenance Order Type.
D)  Assign Inspection Type to the Maintenance Plan Category.
E)  Assign Inspection Type to the Task list header.
.

Question no 2922 : Calibration Plan

In SAP PM/CS ECC6.0 EhP6, which of the following feature process provide follow-up function/activity when recording Calibration results ?

(only one answer)

A)  Inspection Characteristics.
B)  Usage decision code.
C)  Out of tolerance result recording on Inspection Characteristics.
D)  User status activation at Usage Decision.
E)  Writing Measurement Document to Measuring Point from Inspection Characteristics result recording.
.

Question no 2921 : Contract item Maintenance Plan

In SAP PM/CS as at ECC6.0 EhP6 specifically for Contract item Maintenance Plan, the Service Product assigned to the Contract item is used for deriving which of the following data into the Maintenance Item ?

(more than one answers)

A)   Business Area.
B)   Cost Center.
C)   Task List.
D)   Priority.
E)   Planner Group.
.

Thursday, April 2, 2015

Question no 2916 : Single-Cycle vs Strategy Plan

In SAP PM ECC6.0 EhP6, select correct statements comparing Single-Cycle vs Strategy Plan in SAP Plant Maintenance Preventive scenario ?

(more than one answer)

A)  Both Plans only support one unit of measure.
B)  Single-Cycle is only time-based while Strategy Plan can be both time-based and performance-based.
C)  Both support time-based and performance-based.
D)  Both Plans can have one or more Maintenance items.
E)  In Both Plans, only time-based allow cycle modification factor while performance-based does not allow cycle modification.
.    

Question no 2915 : Equipment in Maintenance Item of Maintenance Plans

In SAP PM/CS as at ECC6 EhP6, equipment registration or assignment is not possible in which the the following scenario maintenance plan's maintenance item ?

(only one answer)

A)  IP41 Single Cycle Maintenance Plan.
B)  IP42 Strategy Plan.
C)  IP43 Multi-Counter Plan.
D)  IP40 Service Procurement Maintenance Plan.
E)  IP50 Contract Item Maintenance Plan.
.

Question no 2914 : Cycle Modification Factor

In SAP PM/CS as at ECC6/0 EhP6, you can use the Cycle Modification Factor to increase or reduce the maintenance cycles for which of the Maintenance Plan scenario ?

(more than one answers)

A)   Single-Cycle time-based.
B)   Performance-based Strategy plan.
C)   Time-based Strategy plan.
D)   Multi-Counter plan.
E)   Service Procurement maintenance plan.
.

Wednesday, April 1, 2015

Question no 2911 : General Task List for Single-Cycle Plan

In SAP PM/CS as at ECC6.0, the characteristics of the general task list assigned to the maintenance items in a single-cycle plan include which of the following ?

(only one answer)

A)  Task list for all maintenance items can be different but must have the same maintenance strategy.
B)  Task list for all maintenance items must be the same and need not contain maintenance strategy.
C)  Task list for all maintenance items must be the same and it list must have a maintenance strategy.
D)  Task list for all maintenance items can be different and maintenance strategy is not required.
E)  Task list for all maintenance items can be different but the planner group must be the same.
.

Question no 2910 : Maintenance Item data default from reference object

In SAP PM/CS as at ECC6.0 EhP6, the following data EXCEPT one, are defaulted directly from the reference object (ie: equipment or functional location) to the Maintenance Item data ?

(only one answer)

A)   Business Area.
B)   Planning Plant.
C)   Planner Group.
D)   Maint. Work Center.
E)   Cost Center.
.

Question no 2909 : Single Maintenance Item-based Maintenance Plan

In SAP PM/CS as at ECC6.0 EhP7, which of the following preventive maintenance scenario only allow one maintenance item per maintenance plan ?

(more than one answers)

A)   IP41 Single-Cycle Plan.
B)   IP42 Strategy Plan.
C)   IP43 Multi-Counter Plan.
D)   IP40 Service Procurement Plan.
E)   IP50 Contract item Plan.
.

Question no 2908 : Single vs multiple unit of measure in Maintenance Planning

In SAP PM/CS as at ECC6.0 EhP6, which of the following uses more than one unit of measure for Maintenance Planning ?

(only one answer)

A)  Single-Cycle Time-Based Maintenance Plan.
B)  Single-Cycle Performance-Based Maintenance Plan.
C)  Strategy Plan Time-Based Maintenance Plan.
D)  Strategy Plan Performance-Based Maintenance Plan.
E)  Multi-Counter Plan.
.

Question no 2907 : PM/CS Maintenance Plan Call Objects

In SAP PM/CS ECC6.0 EhP6, Maintenance Plan Call Objects for PM/CS can be the following EXCEPT ?

(only one answer)

A)   Service Order.
B)   Maintenance Order.
C)   Inspection Lot.
D)   Notification.
E)   Service Entry Sheet.
.

Question no 2906 : Action Log in PM/CS

In SAP PM as at ECC6.0 EhP7, which of the following objects at this version and enhancement package are able to record changes in Action Log ?

(more than one answers)

A)   BOM.
B)   General Task List.
C)   Equipment.
D)   Functional Location.
E)   Work Center.
.

Friday, January 16, 2015

Question no 2576 : Multi-Counter Plan

In SAP EAM for Plant Maintenance as at ECC6.0 EhP7, which of the following statements do not correctly depict the features of Multi-Counter Plan ?

(more than one answer)

A)   When the Task List is assigned to the Maintenance Plan, the system will check if the Cycle Set assigned to the Task List header is the same as the Cycle Set assigned to the Multi-Counter Plan initial screen.
B)   You should have a minimum of 2 Maintenance Items when creating a Multi-Counter Plan with a Cycle Set Sequence.
C)   You can shift the Cycle Set Call to which sequence call while perform initial scheduling of the Multi-Counter Plan in IP10, this will allow scheduling to select the Task List associated with the Cycle Set Sequence from the Maintenance Items.
D)   Call Horizon in the Multi-Counter Plan will allow you to Call the maintenance due earlier.
E)   Cycle Modification factor is allowed for Multi-Counter Plan.
.

Sunday, January 12, 2014

Question no 2255 : Results Recording for Maintenance Calibration

In SAP PM/CS ECC6.0, at the Calibration results entry using Result Recording QE51N, what are possible ?

(more then one answers)

A)    Change the Modification Factor of the Maintenance Plan.
B)    Set the Equipment Status.
C)    Enter confirmation hours for the operation.
D)    Change the Valuation suggest by the system.
E)    Close the Maintenance Order.
.

Saturday, January 11, 2014

Question no 2254 : Order type for Calibration Plan

In SAP PM/CS ECC6.0, which of the Order Type is provided by Standard SAP for Calibration Plan ?

(only one answer)

A)    PM01.
B)    PM02.
C)    PM04.
D)    PM05.
E)    PM06.
.

Friday, January 10, 2014

Question no 2253 : Call Object Maintenance/Service Notification

In SAP PM/CS ECC6.0, in a Single Cycle Plan when the call object is a Notification, what is expected of data entry requirement at the Maintenance Item ?

(only one answer)

A)    always only one technical object is allowed for each maintenance item.
B)    more then one technical object is possible for each maintenance item provided the maintenance category is configured to allowed entry in the object list.
C)    always more then one technical object is allowed for each maintenance item.
D)    more then one technical object is possible for each maintenance item provided the notification type assigned to the maintenance item is configured with the screens that allow multiple reference object in the maintenance notification.
E)    more then one technical object is possible for each maintenance item provided the notification type assigned to the maintenance item is configured with the screens that allow multiple reference object in the maintenance notification and  the maintenance category used to create the maintenance plan is also configured to allowed entry in the object list.

Thursday, January 9, 2014

Question no 2252 : Maintenance Item Scheduling

In SAP PM/CS ECC6.0, If a Maintenance Item is registered with multiple technical objects (example: 3 equipment), what is expected of the scheduling results when maintenance is due for the Maintenance Item ? (assuming that the task list contains 3 operations and the call object is a maintenance order)

(only one answer)

A)   3 maintenance order is generated, one for each equipment.
B)   1 maintenance order is generated with 9 operations for the 3 equipments.
C)   1 maintenance order is generated with 3 operations with the original time from the task list for the 3 equipments.
D)   1 maintenance order is generated with 3 operations with the (original time x 3) from the task list for the 3 equipments.
E)   3 maintenance order is generated, one for each equipment provided a configuration is set for the maintenance category used to create the maintenance plan.