In SAP PP or PPPI as at ECC6.0 EhP7, the Costing with Quantity Structure uses which of the following for Planned Cost Calculation ?
(more than one answers)
A) BOM and Standard Routing.
B) Recipe.
C) Based Planning Object.
D) Inspection Plan
E) BOM and Rate Routing
.
(more than one answers)
A) BOM and Standard Routing.
B) Recipe.
C) Based Planning Object.
D) Inspection Plan
E) BOM and Rate Routing
.