The material status in the MRP 1 view can be used to do the following except:
A) block a material from being created with a Routing.
B) block a material from being assigned as a BOM item.
C) block a material from being inserted in a purchased order.
D) block a material from goods issue but allow goods receipt.
E) block a material from being executed in a cost estimate run.
.
A) block a material from being created with a Routing.
B) block a material from being assigned as a BOM item.
C) block a material from being inserted in a purchased order.
D) block a material from goods issue but allow goods receipt.
E) block a material from being executed in a cost estimate run.
.